August-November of 2015: OPTIMA POLAND invested 3 months to complete the project: ”The use of solar energy through the construction of photovoltaic and solar supporting installation for the Independent P M H C in Choroszcz”. 240 solar collectors were installed (480kW total power) and 800 photovoltiac panels (208Kw total power). Heating substations of solar power supplies were placed on buildings to produce hot water for hospital needs. Such a solution is a big savings for each institution. After starting the installation, the hospital will be able to save several hundred thousand zloty per year. EU subsidies enabled us to replace the old boiler house and substitute it with a modern photovoltaic farm for energy and power.
September-October of 2015: OPTIMA POLAND completed the project: ”Installations of solar collectors in the Commune of Szulborze Wielkie”. 70 installations were mounted on residential buildings, which equals 193 solar collectors giving the total power of 386kW.
September-October of 2015: OPTIMA POLAND completed the project: “Building photovoltaic cells in the Commune of Kolaki Koscielne”. 38 households benefited from these installations. 360 panels were installed producing the total power of 93.6k W.
September of 2015: OPTIMA POLAND completed the project: “Comprehensive supply of installations of renewable energy for residents of the Commune of Radzanow”. 25 photovoltaic installations were mounted; 24 on private buildings and one on a public building. 428 installed panels have a total power of 111.28kW.
August-September of 2015: OPTIMA POLAND completed the project: “31 installations of renewable energy sources in the Commune of Bisztynek for residents and nature”. Itemized: 4 installed solar panels (11.34kW total power), 4 installed heat transformers (46.7 kW total power), 5 installed heat pumps (40kWtotal power) and 18 installed photovoltaics with 270 photovoltaics panels (68.85kW total power).
August-September of 2015: OPTIMA POLAND completed the project: “The construction of microinstallations using renewable energy sources in the Commune of Prostki”. A total of 43 photovoltaic installations have been created; 38 of them are on residential buildings and 5 on public buildings. 586 photovoltaic panels have a total power of 152.36kW.
August of 2015: OPTIMA POLAND constructed a system of a ground heat exchanger (vertical) with a heat source in the form of a compressor heat pump with complete metering at the Technical University of Bialystok. Thereby the company created the laboratory station to study the dynamic status of the heat pump under the project: INNO-EKO-TECH (Innovative educational and research center of alternative energy sources, energy efficient construction and environmental protection). In October of the same year OPTIMA POLAND also mounted a set of solar collectors as an integral part of the measurement system.
April-July of 2015: OPTIMA POLAND completed the project:“ Installation of solar systems on private residential buildings and public buildings in the Commune of Bransk”. There were 246 solar energy systems installed which equals 648 solar collectors (1092.12 kw total power).
November of 2014-June of 2015: OPTIMA POLAND completed an installation of solar collectors in the framework of the project, “Sun heat is useful heat, the installation of solar collectors on public and residential buildings in the Municipality of Ciechanowiec”. The subject of the project was the installation of 234 solar energy systems. In total, there were 559 solar collectors installed (761.7kW).
2014: OPTIMA POLAND completed more than 2500 installations of solar collectors and photovoltaic panels in households in rural areas and in the cities throughout Poland. Thanks to renewable energy sources, residents will be able to save money on heating water and producing electricity for their own needs. OPTIMA POLAND guarantees high quality service that enables trouble-free use of devices and customer satisfaction for many years.
May-October of 2014: OPTIMA POLAND within the framework of the project: “Renewable solar energy as a way to improve air quality in the Municipality of Choroszcz”, installed 387 solar energy systems. 380 sets were placed on residential buildings while 7 were placed on public buildings. In total, there were 1089 solar collectors installed in the Municipality of Choroszcz.
April-September of 2014: OPTIMA POLAND completed an order in Wysokie Mazowieckie within the framework of the project: “The use of renewable energy sources in buildings of educational institutions in the County of Wysokie Mazowieckie”. A lower heat source has been done in GRD technology. Within the project, a well has been installed and filled with a glycol solution. The depth of the well was 5826m.